Quote

From:

Bank Details
BSB: 062-948
ACC: 48872355

Quote Number QUO-3
Quote Date 12 March 2026
Total $1,980.00
To:
Rouba

Babkstown

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Supply and install corner table supply and install corner shelf’s supply and install shelves in cupboard paint 1 wall install 2 floating shelf install bathroom cabinet take off rubber Matt wash them and put them back on install actriave for projecter cut metal steel paint main area 2 lines for design

Supply and install corner table supply and install corner shelf’s supply and install shelves in cupboard paint 1 wall install 2 floating shelf install bathroom cabinet take off rubber Matt wash them and put them back on install actriave for projecter cut metal steel paint main area 2 lines for design

$1,800.000.00%$1,800.00
Sub Total $1,800.00
Tax $180.00
Total $1,980.00